AquaDocs is migrating to a new hosting platform. Please do not submit new items. Thank you for your patience.
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Corporate Author
North West WaterDate
1986
Metadata
Show full item recordAbstract
This is the River Irk intensive survey produced by the North West Water in 1986. This report focuses on the Intensive Survey carried out on the River Irk on 15 April 1986. The river Irk was one of the most polluted rivers in North West Water's area. In dry weather the bulk of the flow in the river originated from the 3 sewage works within the catchment (Castleton ETW, Royton ETW and Oldham ETW). The river Irk was badly affected by numerous unsatisfactory storm sewage overflows (SSOs) within the catchment. Several sewerage projects had been carried out within the Irk catchment especially in the Middleton area, where earlier major redevelopment of the old town centre took place between 1969 and 1976, at which time the main sewers were reconstructed. The survey was designed to investigate the changes in the water quality of the river Irk which take place during wet weather. Because of manpower and analytical restrictions the study on Wince Brook and the river Irk upstream of Wince Brook was limited to their bottom reaches.Pages
25Publisher or University
North West Water