AquaDocs is migrating to a new hosting platform. Please do not submit new items. Thank you for your patience.
Effects of Engineering Projects on the Ecology of Moses Lake - Effects of Engineering Projects on Galveston Bay Estuaries
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Author
Johnson, Jr., R. BDate
1966
Metadata
Show full item recordAbstract
In 1964, preliminary work was completed on a portion of the Hurricane Protection Levee which crossed the mouth of Moses Lake, a protected estuary of the Galveston Bay System. During the three year period from 1964-67 this portion of the Hurricane levee remained incomplete, as a closable tide control and navigation structure has been under construction. During this period, exchange of water between Galveston Bay and Moses Lake has been through a temporary ditch, 155 feet wide and 10-12 feet deep, which was reduced to 35 feet in width in October 1966 after the ditch was closed up during a storm threat. Final procedures in construction will be the opening of the tide structure, and shaping and sodding of the levee.Publisher or University
Texas Parks and Wildlife Department