A baseline report of water quality and invertebrate assessment in River Hohwa, Lake Albert: final report
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Corporate Author
National Fisheries Resources Research InstituteDate
2007
Metadata
Show full item recordAbstract
Tullow Oil plc is to launch an onshore Early Production System (EPS) of oil drilling rated at 4,000 barrels of oil per day by 2009. The location of the EPS is in the Kaiso-Tonya area of Block 2 Oil Exploration Zone along Lake Albert within the Albertine graben. Tullow Oil plc contracted Environmental Resources Management (ERM) Southern Africa (Pty) Ltd in conjunction with Environmental Assessment Consult Limited (EACL) to undertake an Environmental Impact Assessment (EIA) for pre-construction and operation of the proposed EPS. ERM in association with EACL requested National Fisheries Resources Research Institute (NaFIRRI) to conduct a baseline survey of water quality and invertebrates in River Hohwa. This study was requested as part of an earlier baseline survey conducted at the Kaiso-Ngassa spit oil exploration area in Block 2. It was conducted at five selected sites (Fig. 1 & Table 1) within the Hohwa River basin in the Kaiso-Tonya Exploration Area 2. The study was pertinent because the targeted oil wells for EPS are upstream this river which drains the Kaiso-Ngassa valley into Ngassa lagoon.Pages
19Publisher or University
National Fisheries Resources Research Institute (NaFIRRI)