The calculated results of current field and its effects on the process of sediment transport at Dong Bo river mouth (Cua Be), Nha Trang
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Author
Vu, Tuan AnhDate
2002
Metadata
Show full item recordAlternative Title
Các kết quả tính trường dòng chảy và ảnh hưởng của nó lên quá trình dịch chuyển trầm tích khu vực cửa sông Đồng Bò (Cửa Bé), Nha TrangAbstract
In dry season, the calculated results for a tidal phase (from 11h/28/4 - 11h/29/4/01) showed that the maximum velocity of the currents was 37 cm/s in ebb-tide phase and 28 cm/s in flood-tide phase. The movement of bottom materials was not considerable, about 1 m3 of bottom materials run out from the study region. In rainy season, in the tidal period (from 23h/4/11 – 23h/5/11/01), the current field was stronger than that in dry season with maximum values of velocities of 100 cm/s and 27 cm/s, in ebb-tide and flood-tide phases, respectively. There was about 10 m3 of bottom materials running out from the region. The maximum erosion rate was 380.10-4 m per 24 hours (tidal period) and the maximum deposition rate was 210.10-4 m per 24 hours.Journal
Collection of Marine Research WorksVolume
XIIPage Range
pp.59-66Resource/Dataset Location
http://113.160.249.209:8080/xmlui/handle/123456789/18970